
Manufacturing
A controlled process, stage by stage
From scrap recipe to bundling, every PanTMT bar follows a documented route with inspection points at each stage.
Process
Four controlled stages
Stage 1
Raw Material Yard
- Raw material receive
- Raw material composition testing
- Raw material uploading (quality wise)
Stage 2
Furnace
- Charging of raw material (standard scrap recipe)
- Composition testing (every 30 min.)
- Maintain standard temperature
- Achieve molten metal quality and temperature, sent for casting
Stage 3
Casting
- Checking of temperature and composition of molten metal
- Casting start
- Water quality check (every 6 hours)
- Billet of requested length
- Checking weight of each billet (online weighing system)
- Checking of temperature (online pyrometer)
- Checking of composition of billet
Stage 4
Rolling Mill
- Rolling process start, passed from Thermex
- Checking mechanical properties of rolled material every 15 min.
- Check weight of rolled material
- Bundling and paint
- Dispatch
Next step
Discuss your requirement
Share your grade, size mix and delivery location — our team will confirm availability and a current quotation.