PanTMT Sariya logoPanTMT SariyaSabse Mazboot, Sabse Surakshit
Glowing billet entering the PanTMT rolling mill

Manufacturing

A controlled process, stage by stage

From scrap recipe to bundling, every PanTMT bar follows a documented route with inspection points at each stage.

Process

Four controlled stages

  1. Stage 1

    Raw Material Yard

    • Raw material receive
    • Raw material composition testing
    • Raw material uploading (quality wise)
  2. Stage 2

    Furnace

    • Charging of raw material (standard scrap recipe)
    • Composition testing (every 30 min.)
    • Maintain standard temperature
    • Achieve molten metal quality and temperature, sent for casting
  3. Stage 3

    Casting

    • Checking of temperature and composition of molten metal
    • Casting start
    • Water quality check (every 6 hours)
    • Billet of requested length
    • Checking weight of each billet (online weighing system)
    • Checking of temperature (online pyrometer)
    • Checking of composition of billet
  4. Stage 4

    Rolling Mill

    • Rolling process start, passed from Thermex
    • Checking mechanical properties of rolled material every 15 min.
    • Check weight of rolled material
    • Bundling and paint
    • Dispatch

Next step

Discuss your requirement

Share your grade, size mix and delivery location — our team will confirm availability and a current quotation.

CallWhatsAppQuote